Monstercraftsman Blog
Link to Monstercraftsman.com
LINK TO MONSTERCRAFTSMAN.COM
Sunday, February 5, 2012
Freshly powder coated 19 and 16's. We disassembled them completely to powder coat them and we are very happy how they turned out.
The ghost of Monstercraftsman
Friday, January 27, 2012
Got some more good stuff done.
built a Solid 3/4 inch Copper kick pedal, shenk, and stainless kick shaft.
Billy hooked my up and helped my fab it onto the stock mounting bracket.
Also figured out the two half shelf gas tanks and got some pieces cut and take it all together. Thanks again Billy.
Tuesday, January 24, 2012
Went down to JB Moto in Wrightsville, Pa. Brian hooked us up with some sweet forks.
Got some more done today between 3:30 and 6:30 a.m.
Now off to JB Moto in Wrightsville Pa to hopefully find some inverted street bike forks.
Friday, January 13, 2012
Ok, the straight hard tail bike is on Hold. Turbo xs650 has taken over for a bit.
Front will actually be a 19" with the Firestone so it will be a little bigger overall which I think will be a good thing.
-Jon
Here is a short video of me welding up the Frame
Thursday, September 22, 2011
Bronze Neck Gussets welded
Bronze Tig welded neck gussets.
Wednesday, September 21, 2011
Bronze Neck Gussets
This will go a long way when the bike is completed and these are taped off and than "blinged" out at the end.
-Jon
Older Posts
Home
Subscribe to:
Posts (Atom)